HIGH POWER CHARGING CUBE

The flexible charging solution for electric trucks and electric cars — Plug & Charge instead of years of grid expansion planning.

The battery-buffered fast-charging system for electric cars, eTrucks and bus fleets – with the HPC Cube you decouple grid connection power from vehicle charging power.

High Power Charging Cube
BENEFITS

Maximum Charging Power for Demanding Fleets

Developed for heavy-duty transport, with its own battery buffering and Plug & Charge installation.

Ready to Use Instantly (Plug & Charge)

No years-long transformer grid expansion required. Arrive, connect, and start charging at up to 200 kW immediately.

Replaces Three Systems in One

Combines battery storage and charging station in one compact container unit.

200 kW Fast-Charging Power

Alpitronic HYC200 CCS charger with Fair Share load distribution for two vehicles at once.

Battery-Buffered up to 685 kWh

Absorbs load peaks and protects the grid connection – even with frequent fast charging.

Mobile & Flexibly Relocatable

Container design allows deployment at changing sites without structural modifications.

Official MAN Reference Partner

Tested and approved for MAN eTGX / eTGL electric truck fleets.

APPLICATIONS

Target Groups & Use Cases for the HPC CUBE

Specifically developed for the high charging power requirements of heavy-duty e-mobility.

Freight Carriers & Logistics Fleets

Depot charging of heavy electric trucks without months of waiting for a medium-voltage transformer.

Public Transit Bus Depots & Municipalities

Fast interim charging of electric transit buses at terminal stops or in urban bus depots.

Municipal Yards with eTruck Charging Needs

Charging electric dump trucks and concrete mixers with up to 200 kW CCS directly at the depot.

CONFIGURATIONS

Two Configurations of the High Power Charging Cube

RVA offers the system in two specified configurations – matched to your required charging power and battery capacity:

Cutaway view of the High Power Charging Cube with battery storage and 200 kW charging technology
CONFIGURATION 1: 10-FOOT CONTAINER

Smart Charging Cube

Mobile charging station in a standard ISO container with 750 kWh high-voltage storage.

Energy Capacity750 kWh
Nominal Voltage800 V DC
Continuous Output Power400 kWh
Charging ConnectionCEE 32 A / 63 A / 125 A or external charging stations
Input ConnectionCEE 32 A / 63 A / 125 A
Dimensions L x W x H2.5 x 2.5 x 2.6 m
Total Weightapprox. 8,500 kg
CONFIGURATION 2: HIGH POWER CHARGING CUBE

HPC Cube (with Alpitronic HYC200)

With integrated 200 kW Alpitronic CCS fast charger & 685 kWh storage.

CCS Charging Power200 kW, two CCS charging cables
Energy Capacity685 kWh
Charging StationAlpitronic HYC200 CCS Charger
Operating ModesFair Share and First-in-First-Serve
Grid ConnectionCEE 32 A (here only with reduced charging power) / 63 A / 125 A
Dimensions L x W x H3.15 x 2.5 x 2.9 m
Total Weightapprox. 7,500 kg

Battery Recharge Times from the Grid (depending on available CEE connection)

CEE 32 A grid connection
24 hours
Slow overnight recharging
CEE 63 A grid connection
12 hours
Standard depot recharging
CEE 125 A grid connection
6 hours
Fast interim charging
REQUEST A QUOTE

Request the HIGH POWER CHARGING CUBE

Get a no-obligation quote including technical design for your depot.